Function cockpit
Supply Chain
Continuous sensing and bounded replanning, with plan stability enforced.
Phase: Phase 3 — Functional orchestration
Sense demand, inventory, capacity and disruption continuously; execute bounded replanning inside stability limits; and put material service trade-offs in front of humans.
Trust score
0
Touchless
0%
Human review
0%
Override rate
0%
Capacity released
20-30% inventory reduction and 5-20% logistics-cost savings (aspiration, not additive)
Accountable human
Chief Supply Chain Officer
CoS agent: Supply Chain Chief of Staff
Every workflow drawn as a line with its stations and live trains
Line map
Supply Chain as a running network
Every workflow is a line. Every stage is a station. Every live piece of work is a train on that line. Diamonds are control gates. Filled squares run inside AI GBS. Click any line to walk it station by station.
Lines running
33
Stations
178
Control gates
30
stations a unit cannot pass without clearing a rule
Interchanges
14
handoffs to another function
Behind timetable
24 of 33
actual cycle time above design
Owns forecast item work end to end inside Supply Chain. Runs 3 lines across 16 stations, drains the repeatable share into the P2P tower, and holds 3 human gates.
Owns supply plan work end to end inside Supply Chain. Runs 3 lines across 17 stations, drains the repeatable share into the M2D tower, and holds 3 human gates.
Owns planning cycle work end to end inside Supply Chain. Runs 3 lines across 17 stations, drains the repeatable share into the P2P tower, and holds 4 human gates.
Owns stock item work end to end inside Supply Chain. Runs 3 lines across 15 stations, drains the repeatable share into the M2D tower, and holds 2 human gates.
Owns shipment work end to end inside Supply Chain. Runs 3 lines across 17 stations, drains the repeatable share into the M2D tower, and holds 2 human gates.
Owns order line work end to end inside Supply Chain. Runs 3 lines across 17 stations, drains the repeatable share into the M2D tower, and holds 1 human gates.
Owns declaration work end to end inside Supply Chain. Runs 3 lines across 15 stations, drains the repeatable share into the M2D tower, and holds 2 human gates.
Owns commit work end to end inside Supply Chain. Runs 3 lines across 14 stations, drains the repeatable share into the M2D tower, and holds 3 human gates.
Owns promise work end to end inside Supply Chain. Runs 3 lines across 15 stations, drains the repeatable share into the M2D tower, and holds 2 human gates.
Owns network study work end to end inside Supply Chain. Runs 3 lines across 17 stations, drains the repeatable share into no shared tower, and holds 4 human gates.
Owns risk event work end to end inside Supply Chain. Runs 3 lines across 18 stations, drains the repeatable share into no shared tower, and holds 4 human gates.