Tier-1 continuity assessment — Meridian
- Owner
- CPO and CSCO
- Value
- 3 SKUs at risk
- Confidence
- 84%
- Age
- 6h 12m
Function cockpit
Continuous sensing and bounded replanning, with plan stability enforced.
Phase: Phase 3 — Functional orchestration
Sense demand, inventory, capacity and disruption continuously; execute bounded replanning inside stability limits; and put material service trade-offs in front of humans.
Trust score
0
Touchless
0%
Human review
0%
Override rate
0%
Capacity released
20-30% inventory reduction and 5-20% logistics-cost savings (aspiration, not additive)
Accountable human
Chief Supply Chain Officer
CoS agent: Supply Chain Chief of Staff
Live work moving through the lifecycle
Ops floor
Each lane is a lifecycle stage. Cyan items are closing without a person; amber items have stopped at a gate and are waiting on a decision.
Tier-1 continuity assessment — Meridian
Node paused on instability signature
Scenario twin — dual-source resin strategy
Replenishment run — EMEA distribution centers
Carrier allocation — week 34 outbound
Port closure recovery — three costed options