Connect · item 15
Data quality gates at intake
Bad data does not become less expensive further down the line. Sixteen checks sit at the first station of every line, covering completeness, validity, duplication, referential integrity, timeliness and consistency. A unit that fails is blocked outright or held in a quarantine queue with a named owner — never quietly waved through with a flag nobody reads.
Health
What the rules are catching
Active and monitoring rules, and everything they have held, released or rejected.
What the gates test for
Six dimensions. A check that has never fired is shown as never having fired, not as evidence of a clean estate.
What happens on failure
The action is stated on the gate, not decided later.
Gates that have never fired
Reported as a zero, not as a pass.
The gates
Each names the dimension it tests, the expression it evaluates, what happens when it fails, and who owns the failures.
| Gate | Dimension | Applies to | Expression | On failure | Run | Failed | Pass | Held | Owner |
|---|---|---|---|---|---|---|---|---|---|
| DQ-01 Mandatory header fields present High | Completeness | Every unit at the first station of its line all-lines | requester, value, materiality and jurisdiction are all non-empty at intake | Quarantine threshold 99.5% | 16,420 | 67 | 99.6% | 4 | N. Ferreira |
| DQ-02 Supplier exists and is not blocked Critical | Referential | Source-to-pay intake function Source-to-Pay Suite | supplier identifier resolves to an active, non-blocked record in the source-to-pay suite | Block threshold 100% | 8,379 | 44 | 99.5% | 9 | K. Boateng |
| DQ-03 Invoice not already presented Critical | Duplication | Invoice capture intake function Invoice Capture and AP Automation | supplier plus invoice number plus gross amount has not been seen in the trailing 400 days | Block threshold 100% | 6,924 | 44 | 99.4% | 13 | M. Okonjo |
| DQ-04 Amount is a parseable figure in a known currency High | Validity | Any unit carrying a value all-lines Group ERP — Financials | value parses to a positive decimal and the currency code appears in the group currency table | Quarantine threshold 99.9% | 22,089 | 66 | 99.7% | 6 | D. Halvorsen |
| DQ-05 Cost center is open in the period High | Referential | Anything that will post to the ledger all-lines Planning and Consolidation | cost center exists in planning and is open for the posting period | Quarantine threshold 99.5% | 15,036 | 62 | 99.6% | 6 | D. Halvorsen |
| DQ-06 Purchase order is open and has remaining value Critical | Referential | Three-way match intake function Group ERP — Materials and Inventory | referenced purchase order exists in materials management, is open, and remaining value covers the invoice | Quarantine threshold 99% | 19,227 | 100 | 99.5% | 8 | K. Boateng |
| DQ-07 Tax code valid for the jurisdiction pair High | Validity | Cross-border invoice and order intake all-lines Indirect Tax Engine | tax code returned by the engine is valid for the ship-from and ship-to jurisdiction pair on the date of supply | Quarantine threshold 99% | 3,123 | 9 | 99.7% | 5 | F. Aubert |
| DQ-08 Worker record active at the effective date Critical | Referential | Hire-to-retire intake function Core HR and Payroll | the worker referenced holds an active record in core human resources on the effective date of the change | Block threshold 100% | 18,379 | 75 | 99.6% | 7 | S. Bergqvist |
| DQ-09 No conflicting open unit for the same subject Medium | Duplication | Every line all-lines | no other open unit on the same line carries the same subject identifier | Warn threshold 98% | 10,482 | 43 | 99.6% | 8 | N. Ferreira |
| DQ-10 Source extract inside its freshness commitment High | Timeliness | Any unit relying on an inbound feed all-lines | every source system the unit reads has synchronized within its committed freshness window | Warn threshold 97% | 945 | 15 | 98.4% | 8 | N. Ferreira |
| DQ-11 Contract reference resolves to an executed agreement High | Referential | Legal, procurement and sales intake all-lines Contract Lifecycle Management | the contract identifier resolves to an executed, in-term agreement in contract lifecycle management | Quarantine threshold 99% | 13,082 | 39 | 99.7% | 5 | V. Marchetti |
| DQ-12 Configuration item has a named owner Medium | Completeness | Technology change and incident intake function Configuration Management Database | the configuration item referenced has an owning team recorded in the configuration database | Warn threshold 95% | 12,436 | 65 | 99.5% | 7 | J. Petrakis |
| DQ-13 Bank detail change carries out-of-band confirmation Critical | Validity | Supplier master change intake function Source-to-Pay Suite | any change to supplier bank detail is accompanied by an out-of-band confirmation reference | Block threshold 100% | 17,598 | 33 | 99.8% | 1 | L. Duarte |
| DQ-14 Quantities agree between order and receipt Medium | Consistency | Goods receipt intake function Group ERP — Materials and Inventory | received quantity is within the agreed variance of ordered quantity for the material and supplier | Quarantine threshold 98% | 15,218 | 62 | 99.6% | 6 | R. Nakamura |
| DQ-15 Personal data fields carry a classification Highmonitoring only | Completeness | Any unit whose payload may contain personal data all-lines | each field flagged as person-linked carries a classification label before the unit enters the line | Quarantine threshold 99% | 14,392 | 43 | 99.7% | 2 | S. Bergqvist |
| DQ-16 Research payload provenance recorded Mediummonitoring only | Completeness | Research and development intake function Research Notebook and Experiment Data | experiment payloads name their notebook entry and protocol version | Warn threshold 95% | 9,928 | 0 | 100% | 0 | P. Iyer |
Quarantine queue
28 items match the current filter. Every held item has an owner and an age.
| Item | Function · line | Gate | Field | Observed | Expected | Source | Age | Status | Owner | Outcome |
|---|---|---|---|---|---|---|---|---|---|---|
| GB1B-1039 Payroll transaction at authority check DQ-07-Q-009 | AI GBS & Global Business Services GB1B | DQ-07 | tax code returned by | out of range | tax code returned by the engine is valid for the ship-from and ship-to jurisdiction pair on the date of supply | Indirect Tax Engine | 8.9 days | In review | F. Aubert | — |
| PR3A-1055 Sourcing event at build longlist DQ-06-Q-007 | Procurement & Source-to-Pay PR3A | DQ-06 | referenced purchase order exists | no matching record | referenced purchase order exists in materials management, is open, and remaining value covers the invoice | Group ERP — Materials and Inventory | 8.8 days | In review | K. Boateng | — |
| PR6C-1000 Supplier record at deactivate DQ-03-Q-008 | Procurement & Source-to-Pay PR6C | DQ-03 | supplier plus invoice number | already seen | supplier plus invoice number plus gross amount has not been seen in the trailing 400 days | Invoice Capture and AP Automation | 7.7 days | In review | M. Okonjo | — |
| PR8B-1026 Requisition at classify DQ-06-Q-011 | Procurement & Source-to-Pay PR8B | DQ-06 | referenced purchase order exists | no matching record | referenced purchase order exists in materials management, is open, and remaining value covers the invoice | Group ERP — Materials and Inventory | 7.3 days | In review | K. Boateng | — |
| GB3A-1016 Invoice at send DQ-07-Q-001 | AI GBS & Global Business Services GB3A | DQ-07 | tax code returned by | out of range | tax code returned by the engine is valid for the ship-from and ship-to jurisdiction pair on the date of supply | Indirect Tax Engine | 7.2 days | In review | F. Aubert | — |
| PR7B-1026 Supplier review at draft agenda DQ-03-Q-009 | Procurement & Source-to-Pay PR7B | DQ-03 | supplier plus invoice number | already seen | supplier plus invoice number plus gross amount has not been seen in the trailing 400 days | Invoice Capture and AP Automation | 6.8 days | In review | M. Okonjo | — |
| IT1C-1025 Ticket at reroute DQ-12-Q-014 | Information Technology IT1C | DQ-12 | the configuration item referenced | empty | the configuration item referenced has an owning team recorded in the configuration database | Configuration Management Database | 6.8 days | In review | J. Petrakis | — |
| PR6A-1036 Supplier record at register DQ-02-Q-009 | Procurement & Source-to-Pay PR6A | DQ-02 | supplier identifier resolves to | no matching record | supplier identifier resolves to an active, non-blocked record in the source-to-pay suite | Source-to-Pay Suite | 6.6 days | In review | K. Boateng | — |
| PR6C-1056 Supplier record at notify owner DQ-03-Q-007 | Procurement & Source-to-Pay PR6C | DQ-03 | supplier plus invoice number | already seen | supplier plus invoice number plus gross amount has not been seen in the trailing 400 days | Invoice Capture and AP Automation | 6.5 days | In review | M. Okonjo | — |
| RD9A-1004 Collaboration at kick off DQ-09-Q-008 | Research & Development RD9A | DQ-09 | no other open unit | already seen | no other open unit on the same line carries the same subject identifier | Enterprise Data Warehouse | 6.5 days | In review | N. Ferreira | — |
| PR2B-1026 Spend line at notify requester DQ-06-Q-014 | Procurement & Source-to-Pay PR2B | DQ-06 | referenced purchase order exists | no matching record | referenced purchase order exists in materials management, is open, and remaining value covers the invoice | Group ERP — Materials and Inventory | 6.5 days | In review | K. Boateng | — |
| PR5C-1019 Supplier contract at assess value DQ-11-Q-002 | Procurement & Source-to-Pay PR5C | DQ-11 | the contract identifier resolves | no matching record | the contract identifier resolves to an executed, in-term agreement in contract lifecycle management | Contract Lifecycle Management | 6.1 days | In review | V. Marchetti | — |
| HR2D-1002 Requisition at gather evidence DQ-08-Q-008 | Human Resources HR2D | DQ-08 | the worker referenced holds | no matching record | the worker referenced holds an active record in core human resources on the effective date of the change | Core HR and Payroll | 5.3 days | In review | S. Bergqvist | — |
| AD1B-1001 Work order at dispatch DQ-10-Q-007 | Administration AD1B | DQ-10 | every source system the | outside window | every source system the unit reads has synchronized within its committed freshness window | Enterprise Data Warehouse | 5.1 days | In review | N. Ferreira | — |
| IT2A-1001 Access request at derive role DQ-12-Q-002 | Information Technology IT2A | DQ-12 | the configuration item referenced | empty | the configuration item referenced has an owning team recorded in the configuration database | Configuration Management Database | 4.4 days | In review | J. Petrakis | — |
| SC7A-1048 Declaration at log DQ-14-Q-002 | Supply Chain SC7A | DQ-14 | received quantity is within | out of range | received quantity is within the agreed variance of ordered quantity for the material and supplier | Group ERP — Materials and Inventory | 4.3 days | In review | R. Nakamura | — |
| RD1A-1008 Research thread at draft findings DQ-10-Q-009 | Research & Development RD1A | DQ-10 | every source system the | outside window | every source system the unit reads has synchronized within its committed freshness window | Enterprise Data Warehouse | 4.3 days | In review | N. Ferreira | — |
| PR7B-1008 Supplier review at owner review DQ-04-Q-007 | Procurement & Source-to-Pay PR7B | DQ-04 | value parses to a | out of range | value parses to a positive decimal and the currency code appears in the group currency table | Group ERP — Financials | 4.2 days | In review | D. Halvorsen | — |
| SC9B-1018 Promise at notify DQ-14-Q-007 | Supply Chain SC9B | DQ-14 | received quantity is within | out of range | received quantity is within the agreed variance of ordered quantity for the material and supplier | Group ERP — Materials and Inventory | 4.0 days | In review | R. Nakamura | — |
| PR11C-1014 Savings claim at reconcile to budget DQ-06-Q-013 | Procurement & Source-to-Pay PR11C | DQ-06 | referenced purchase order exists | no matching record | referenced purchase order exists in materials management, is open, and remaining value covers the invoice | Group ERP — Materials and Inventory | 4.0 days | In review | K. Boateng | — |
| CS1C-1039 Contact at detect surge DQ-10-Q-001 | Customer Service CS1C | DQ-10 | every source system the | outside window | every source system the unit reads has synchronized within its committed freshness window | Enterprise Data Warehouse | 3.8 days | In review | N. Ferreira | — |
| SC11C-1012 Risk event at challenge DQ-14-Q-010 | Supply Chain SC11C | DQ-14 | received quantity is within | out of range | received quantity is within the agreed variance of ordered quantity for the material and supplier | Group ERP — Materials and Inventory | 3.6 days | In review | R. Nakamura | — |
| PR2C-1009 Spend line at rank DQ-02-Q-014 | Procurement & Source-to-Pay PR2C | DQ-02 | supplier identifier resolves to | no matching record | supplier identifier resolves to an active, non-blocked record in the source-to-pay suite | Source-to-Pay Suite | 2.4 days | In review | K. Boateng | — |
| HR11A-1031 Change at classify DQ-08-Q-012 | Human Resources HR11A | DQ-08 | the worker referenced holds | no matching record | the worker referenced holds an active record in core human resources on the effective date of the change | Core HR and Payroll | 2.3 days | In review | S. Bergqvist | — |
| HR6B-1019 Learning path at evidence file DQ-01-Q-008 | Human Resources HR6B | DQ-01 | requester, value, materiality and | empty | requester, value, materiality and jurisdiction are all non-empty at intake | Enterprise Data Warehouse | 2.3 days | In review | N. Ferreira | — |
| HR5B-1004 Review at bias scan DQ-08-Q-005 | Human Resources HR5B | DQ-08 | the worker referenced holds | no matching record | the worker referenced holds an active record in core human resources on the effective date of the change | Core HR and Payroll | 35 hr | In review | S. Bergqvist | — |
| HR1B-1000 Plan scenario at re-model DQ-04-Q-002 | Human Resources HR1B | DQ-04 | value parses to a | out of range | value parses to a positive decimal and the currency code appears in the group currency table | Group ERP — Financials | 20 hr | In review | D. Halvorsen | — |
| PR1B-1011 Category plan at frame DQ-03-Q-018 | Procurement & Source-to-Pay PR1B | DQ-03 | supplier plus invoice number | already seen | supplier plus invoice number plus gross amount has not been seen in the trailing 400 days | Invoice Capture and AP Automation | 7 hr | In review | M. Okonjo | — |
Which lines carry the intake burden
Quarantine volume by function, all time.
Actions
What is waiting on a person
Quarantine is a holding pen, not a decision. Every item below is work that stopped and is waiting for somebody to say what happens to it.
Judge a quarantined item
Held by a rule. Nobody has looked at it yet.
Fix the source behind a rejection
Rejected items keep arriving until the upstream cause changes.
Finish a review already open
Picked up, not concluded.
Promote a monitoring rule to active
The rule watches and reports but does not hold anything.
Operations
What this desk is allowed to start
A surface that only reports is not operable. This is the work this page can set in motion, and the bound it runs into.
Trigger and bound
This desk can start a rule run across a named batch, and it can move an item into quarantine. It cannot release an item, reject one, or change a threshold — releasing bad data is the whole risk this layer exists to manage, so it stays with a person.
Live observability
What the record shows right now
What happened to everything the rules have held.
Current distribution
171 items
Is policy and strategy coming to fruition
Whether the written intent is holding here
14 of 16 rules are enforcing. 95 items are held and undecided.
Not holding on the record
The written intent is that no unchecked record reaches a downstream figure. 14 rules enforce that today and 2 only watch. The queue is the real test: 67 items are held with nobody assigned and 28 are open with somebody assigned, against 47 released and 29 rejected historically. A held item is not a failure of the rule — it is the rule working — but a held item nobody judges is a figure quietly missing its input.
The gates, the expressions, the thresholds and the quarantine queue are real mechanisms. They run at the first station of every line and they hold work that fails. What they run against is the modeled feed described on the connector registry — connect a customer instance and the same gates run unchanged against real intake.
2 of the 16 gates are set to monitor rather than enforce. They are counted in the check totals but they stop nothing. That is a deliberate state for a gate whose false-positive rate has not yet been characterized, and it is shown rather than hidden behind an overall pass rate.
62 items have been held for more than seventy-two hours, the oldest for 9.1 days. A quarantine queue that ages without clearing is a queue that people have learned to route around, so the age is shown on every row and never averaged away.