LensReading which lens this session carries.
The catalogueAI GBS & Global Business ServicesGlobal Process OwnershipAnalytical

Service GB6B

Control Design Review

Runs analytical. Starts when the reporting period closes. It runs 18 times a week across 5 stations. One of those stations stops for a person and 4 are done by an agent, 1 of them on the shared spine.

Runs a week

18

84 in flight right now.

Stations

5

1 person · 3 agent · 1 spine

Agent share of steps

80%

Autonomy on this service is set at 48% against a ceiling of 66%.

Decisions a person makes

1

Held by Global Process Owner.

Touchless

43%

Share of runs that complete without anybody opening them.

Timetable against actual

42.6h

Actual 34.6h, 8.0h under the timetable.

Operations

The lane diagram

Read it left to right.

Person1 station and 33% of the dwellAgent3 stations and 53% of the dwellShared spine1 station and 14% of the dwell2 crossings between lanes
Human
decides
Agent
does the work
GBS
shared spine
System
attributed by rule
Enterprise Data Warehouse
Group ERP — Financials
Core HR and Payroll
Group ERP — Financials
Group ERP — Financials
Click any station to see who does it, what it costs in time, the rule that gates it and the system attributed to it.

Operations

Every station in order

The same stations as a list, with the dwell the estate records against each one and the system a station of that shape would touch.

#StationLaneWhoLayerDwellTargetIn flightSystem
1

Map risks

AgentProcess Model Agentworkflow12h 52m16h 22m27Enterprise Data Warehouse
2

Design controls

AgentVariant Detection Agentworkflow7h 25m13h 49m43Group ERP — Financials
3

Test design

AgentStandardization Agentworkflow6h 25m14h 50m12Core HR and Payroll
4

Approve

Held for a named human when the unit exceeds the process standard decision envelope, when confidence falls below the floor, or when a policy clause is engaged.

HumanGlobal Process Ownerpolicy16h 50m23h 54m0Group ERP — Financials
5

Embed

GBSControl Design Agentgbs7h 15m16h 53m2Group ERP — Financials

Operations

Run it

Change the volume, move the autonomy line, release a gate, and watch what happens to the hours in each lane and to the time it takes one run to get through.

Move something
Demand100%
18 a week is what the estate records.
Decisions handed to agents0 of 0
This service has at most one gate, so there is nothing to hand over without removing the last human decision.
People on the gates9 people
Each one is assumed to have 2,100 productive minutes a week, which is 35 hours.
Agent speed100%
100% is the dwell the estate records today.
Person time a week
303h
18 items at 1,010 minutes of decision each.
Agent time a week
611.1h
2,037 minutes an item, which does not compete for a person.
Gate load
96%
Inside capacity, with 12h of headroom.
Stations without a person
80%
1 gate left on 5 stations.
Where an item spends its time
33% waiting on a person
67% in the agent lane
An item now takes 3,047 minutes of worked time end to end against 3,047 in the recorded estate, a change of +0%. This is worked time, not calendar time: nothing here models a queue or a weekend.
What this model is, on Control Design Review

The simulation is arithmetic on the estate, not a queueing model.

How it runs

Run it again, going wrong

The same unit and the same stations, broken the way the estate already records breaking.

5 stations, walked twice

Once clean, once with the categories the estate counts

This is the same unit on the same stations, breaking.

No break below was chosen.

One play head, two tracks, the same scale. The clean run stops when it runs out of stations; the other one keeps going.

As written

5 stations, nothing waiting, nothing sent back

0 min of 2.1 days

now Map risks · Process Model Agent · 13 hrs

As the ledger has it

the same stations, plus 2 categories the estate already counts

0 min of 2.2 days

now Map risks · Process Model Agent · 13 hrs

personagentshared spinework the break addsnobody working it

What breaks, and where it is counted

No break below was chosen.

What the two runs say together

2 counted categories land on this procedure.

What this run cannot claim

These breaks are shown together on one unit so the shape of a bad day fits on one screen.

Two clocks run. Worked time is the sum of the time the work is actually being done …

Live observability

Systems this service would touch

Attributed by rule from the function's system list.

3 systems attributed

0 of 3 returning records

Group ERP — Financials

SAP S/4HANA · ledger · bidirectional · critical

modeled

3 of 5 stations attributed here · would write back

Enterprise Data Warehouse

Snowflake · analytics · inbound · critical

modeled

1 of 5 stations attributed here · read only

Core HR and Payroll

Workday HCM · hcm · bidirectional · critical

modeled

1 of 5 stations attributed here · would write back

System attribution is a rule, not a reading.

Who runs it

Orchestration and accountability

Orchestrated by
Process Ownership Orchestrator
That orchestrator’s remit
Owns process standard work end to end inside AI GBS & Global Business Services. Runs 3 lines across 19 stations, drains the repeatable share into no shared tower, and holds 3 human gates.
Accountable person
Global Process Owner
Sub-function
Global Process Ownership
Shared spine tower
Not on the shared spine
Hand-over points
None — this service stays inside its function

Other services in this sub-function

2 alongside this one

What this page is and is not

This is a catalogue of the modeled estate.