LensReading which lens this session carries.
EN2B

Zoom 3 of 3 — line

Pattern Compliance Sweep

Transactional line · Engineering · Architecture & Design

Runs when: Runs transactional. Starts when a threshold is crossed.

6939

units a week

67%

touchless

5

stations

6.6h

timetable

8.3h

actual

+26%

vs timetable

3 clear4 evidenced0 held

Station walk

Every stage, who owns it, and what is sitting there

Each station names the agent that runs it and the layer it belongs to. Gates name the rule and the human approver. Trains parked at a station are live units of work — click one to read its full evidence trail.

  1. 01

    Scan repositories

    AI GBS AI GBS depot

    run by Architecture Orchestrator

    dwell 140msla 289mqueued 38
  2. 02

    Flag deviation

    Workflow

    run by Pattern Compliance Agent

    dwell 171msla 317mqueued 27
  3. 03

    Auto-file issue

    AI GBS AI GBS depot

    run by Pattern Compliance Agent

    dwell 94msla 169mqueued 7
  4. 04

    Owner review

    Policy

    run by Chief Architect

    Gate: Held for a named human when the unit exceeds the design decision decision envelope, when confidence falls below the floor, or when a policy clause is engaged.

    approver Chief Architect

    dwell 169msla 348mqueued 0
  5. 05

    Close

    Workflow

    run by Design Review Prep Agent

    dwell 78msla 156mqueued 17

Live trains on this line

7 units in motion right now

RefWorkHeld byValueStatusAge / SLA
EN2B-1003

Design decision at flag deviation

Callum Ferreira

Pattern Compliance Agent

agent

$73kEvidence posted2h 34m / 5h 17m
EN2B-1007

Design decision at owner review

Nadia Muller

Non-functional Requirements Agent

agent

$33kEvidence posted4h 17m / 5h 48m
EN2B-1014

Design decision at auto-file issue

Grace Novak

GBS spine

gbs

$6kIn flight3h 16m / 2h 49m
EN2B-1023

Design decision at flag deviation

Rafael Sandoval

Architecture Orchestrator

agent

$5kIn flight3h 52m / 5h 17m
EN2B-1032

Design decision at auto-file issue

Anika Duarte

GBS spine

gbs

$76kEvidence posted3h 24m / 2h 49m
EN2B-1041

Design decision at scan repositories

Rafael Delgado

GBS spine

gbs

$62kEvidence posted1h 6m / 4h 49m
EN2B-1046

Design decision at scan repositories

Mei Adeyemi

GBS spine

gbs

$86kIn flight1h 53m / 4h 49m
Back to the Engineering line map