Explain this number
The highest-consequence open item
The open item with the highest consequence score. The score is four factor points summing exactly to the total: commitment, downstream, money and legal clock.
How it is computed
The open item with the maximum consequence, with its four factors.
the open QueueItem with the maximum consequence, joined to QueueFactor
Q-0001 scores 89 and sits with Jordan Ellis: Outsourced cost: $327,238,177 claimed and never verified
The four factor points sum exactly to the score. The ceilings of 40, 30, 20 and 10 are a scheme we chose and have not agreed with anyone.
The records behind it
Named rows, read live. These are the actual records the figure is standing on, not a sample chosen to illustrate it.
Where it appears and how to reach it
This figure is rendered on The Single Queue. Open that page →
What this figure is, and what it is not
The ceilings of 40, 30, 20 and 10 are a scheme we chose. They have not been agreed with anyone.
Thirty-four figures carry a definition, a basis, an owner and a live query. Those are the figures on the surfaces built for this mechanism. Most numbers elsewhere in the product do not have an entry here yet, and this catalog says so rather than implying whole-product coverage.
You are seeing this as requester. The figure above was recomputed when this page loaded, so it is as fresh as the rows themselves.