LensReading which lens this session carries.
The catalogueSupply ChainSupplier CollaborationTransactional

Service SC8A

Forecast Collaboration

Runs transactional. Starts when a threshold is crossed. It runs 4,122 times a week across 5 stations. One of those stations stops for a person and 4 are done by an agent, 3 of them on the shared spine.

Runs a week

4,122

127 in flight right now.

Stations

5

1 person · 1 agent · 3 spine

Agent share of steps

80%

Autonomy on this service is set at 79% against a ceiling of 85%.

Decisions a person makes

1

Held by Director, Supplier Collaboration.

Touchless

79%

Share of runs that complete without anybody opening them.

Timetable against actual

6.8h

Actual 7.5h, 0.7h over the timetable.

Operations

The lane diagram

Read it left to right.

Person1 station and 45% of the dwellAgent1 station and 1% of the dwellShared spine3 stations and 54% of the dwell3 crossings between lanes
Human
decides
Agent
does the work
GBS
shared spine
System
attributed by rule
Group ERP — Materials and Inventory
Group ERP — Materials and Inventory
Enterprise Data Warehouse
Group ERP — Materials and Inventory
Group ERP — Materials and Inventory
Click any station to see who does it, what it costs in time, the rule that gates it and the system attributed to it.

Operations

Every station in order

The same stations as a list, with the dwell the estate records against each one and the system a station of that shape would touch.

#StationLaneWhoLayerDwellTargetIn flightSystem
1

Publish forecast

GBSForecast Sharing Agentgbs23m33m23Group ERP — Materials and Inventory
2

Collect commit

GBSForecast Sharing Agentgbs2h 1m2h 44m46Group ERP — Materials and Inventory
3

Detect gap

AgentCapacity Visibility Agentworkflow5m11m9Enterprise Data Warehouse
4

Negotiate

Held for a named human when the unit exceeds the commit decision envelope, when confidence falls below the floor, or when a policy clause is engaged.

HumanDirector, Supplier Collaborationpolicy4h 11m9h 36m5Group ERP — Materials and Inventory
5

Confirm

GBSForecast Sharing Agentgbs2h 32m3h 53m44Group ERP — Materials and Inventory

Operations

Run it

Change the volume, move the autonomy line, release a gate, and watch what happens to the hours in each lane and to the time it takes one run to get through.

Move something
Demand100%
4,122 a week is what the estate records.
Decisions handed to agents0 of 0
This service has at most one gate, so there is nothing to hand over without removing the last human decision.
People on the gates493 people
Each one is assumed to have 2,100 productive minutes a week, which is 35 hours.
Agent speed100%
100% is the dwell the estate records today.
Person time a week
17,243.7h
4,122 items at 251 minutes of decision each.
Agent time a week
20,678.7h
301 minutes an item, which does not compete for a person.
Gate load
100%
Inside capacity, with 11.3h of headroom.
Stations without a person
80%
1 gate left on 5 stations.
Where an item spends its time
45% waiting on a person
55% in the agent lane
An item now takes 552 minutes of worked time end to end against 552 in the recorded estate, a change of +0%. This is worked time, not calendar time: nothing here models a queue or a weekend.
What this model is, on Forecast Collaboration

The simulation is arithmetic on the estate, not a queueing model.

How it runs

Run it again, going wrong

The same unit and the same stations, broken the way the estate already records breaking.

5 stations, walked twice

Once clean, once with the categories the estate counts

This is the same unit on the same stations, breaking.

No break below was chosen.

One play head, two tracks, the same scale. The clean run stops when it runs out of stations; the other one keeps going.

As written

5 stations, nothing waiting, nothing sent back

0 min of 9.2 hrs

now Publish forecast · Forecast Sharing Agent · 23 min

As the ledger has it

the same stations, plus 5 categories the estate already counts

0 min of 23 hrs

now Publish forecast · Forecast Sharing Agent · 23 min

personagentshared spinework the break addsnobody working it

What breaks, and where it is counted

No break below was chosen.

What the two runs say together

5 counted categories land on this procedure.

What this run cannot claim

These breaks are shown together on one unit so the shape of a bad day fits on one screen.

The separation register records a duty conflict against a sub-function and a named post, not against one procedure.

Two clocks run. Worked time is the sum of the time the work is actually being done …

Live observability

Systems this service would touch

Attributed by rule from the function's system list.

2 systems attributed

0 of 2 returning records

Group ERP — Materials and Inventory

SAP S/4HANA MM · supply · bidirectional · high

modeled

4 of 5 stations attributed here · would write back

Enterprise Data Warehouse

Snowflake · analytics · inbound · critical

modeled

1 of 5 stations attributed here · read only

System attribution is a rule, not a reading.

Who runs it

Orchestration and accountability

Orchestrated by
Supplier Collaboration Orchestrator
That orchestrator’s remit
Owns commit work end to end inside Supply Chain. Runs 3 lines across 14 stations, drains the repeatable share into the M2D tower, and holds 3 human gates.
Accountable person
Director, Supplier Collaboration
Sub-function
Supplier Collaboration
Shared spine tower
m2d
Hand-over points
None — this service stays inside its function

Other services in this sub-function

2 alongside this one

What this page is and is not

This is a catalogue of the modeled estate.