LensReading which lens this session carries.
The catalogueSupply ChainDemand PlanningTransactional

Service SC1B

Demand Signal Response

Runs transactional. Starts when a request lands in the queue. It runs 4,298 times a week across 4 stations. One of those stations stops for a person and 3 are done by an agent, 2 of them on the shared spine.

Runs a week

4,298

32 in flight right now.

Stations

4

1 person · 1 agent · 2 spine

Agent share of steps

75%

Autonomy on this service is set at 84% against a ceiling of 87%.

Decisions a person makes

1

Held by Director, Demand Planning.

Touchless

85%

Share of runs that complete without anybody opening them.

Timetable against actual

19.7h

Actual 20.0h, 0.3h over the timetable.

Operations

The lane diagram

Read it left to right.

Person1 station and 27% of the dwellAgent1 station and 29% of the dwellShared spine2 stations and 44% of the dwell3 crossings between lanes
Human
decides
Agent
does the work
GBS
shared spine
System
attributed by rule
Group ERP — Materials and Inventory
Enterprise Data Warehouse
Group ERP — Materials and Inventory
Group ERP — Materials and Inventory
Click any station to see who does it, what it costs in time, the rule that gates it and the system attributed to it.

Operations

Every station in order

The same stations as a list, with the dwell the estate records against each one and the system a station of that shape would touch.

#StationLaneWhoLayerDwellTargetIn flightSystem
1

Detect deviation

GBSStatistical Forecast Agentgbs5m8m1Group ERP — Materials and Inventory
2

Diagnose

AgentPromotion Lift Agentworkflow1h 14m2h 47m24Enterprise Data Warehouse
3

Adjust within band

GBSStatistical Forecast Agentgbs1h 47m3h 49m4Group ERP — Materials and Inventory
4

Escalate outside band

Held for a named human when the unit exceeds the forecast item decision envelope, when confidence falls below the floor, or when a policy clause is engaged.

HumanDirector, Demand Planningpolicy1h 8m2h 24m3Group ERP — Materials and Inventory

Operations

Run it

Change the volume, move the autonomy line, release a gate, and watch what happens to the hours in each lane and to the time it takes one run to get through.

Move something
Demand100%
4,298 a week is what the estate records.
Decisions handed to agents0 of 0
This service has at most one gate, so there is nothing to hand over without removing the last human decision.
People on the gates140 people
Each one is assumed to have 2,100 productive minutes a week, which is 35 hours.
Agent speed100%
100% is the dwell the estate records today.
Person time a week
4,871.1h
4,298 items at 68 minutes of decision each.
Agent time a week
13,323.8h
186 minutes an item, which does not compete for a person.
Gate load
99%
Inside capacity, with 28.9h of headroom.
Stations without a person
75%
1 gate left on 4 stations.
Where an item spends its time
27% waiting on a person
73% in the agent lane
An item now takes 254 minutes of worked time end to end against 254 in the recorded estate, a change of +0%. This is worked time, not calendar time: nothing here models a queue or a weekend.
What this model is, on Demand Signal Response

The simulation is arithmetic on the estate, not a queueing model.

How it runs

Run it again, going wrong

The same unit and the same stations, broken the way the estate already records breaking.

4 stations, walked twice

Once clean, once with the categories the estate counts

This is the same unit on the same stations, breaking.

No break below was chosen.

One play head, two tracks, the same scale. The clean run stops when it runs out of stations; the other one keeps going.

As written

4 stations, nothing waiting, nothing sent back

0 min of 4.2 hrs

now Detect deviation · Statistical Forecast Agent · 5 min

As the ledger has it

the same stations, plus 5 categories the estate already counts

0 min of 19 hrs

now Detect deviation · Statistical Forecast Agent · 5 min

personagentshared spinework the break addsnobody working it

What breaks, and where it is counted

No break below was chosen.

What the two runs say together

5 counted categories land on this procedure.

What this run cannot claim

These breaks are shown together on one unit so the shape of a bad day fits on one screen.

The separation register records a duty conflict against a sub-function and a named post, not against one procedure.

Two clocks run. Worked time is the sum of the time the work is actually being done …

Live observability

Systems this service would touch

Attributed by rule from the function's system list.

2 systems attributed

0 of 2 returning records

Group ERP — Materials and Inventory

SAP S/4HANA MM · supply · bidirectional · high

modeled

3 of 4 stations attributed here · would write back

Enterprise Data Warehouse

Snowflake · analytics · inbound · critical

modeled

1 of 4 stations attributed here · read only

System attribution is a rule, not a reading.

Who runs it

Orchestration and accountability

Orchestrated by
Demand Planning Orchestrator
That orchestrator’s remit
Owns forecast item work end to end inside Supply Chain. Runs 3 lines across 16 stations, drains the repeatable share into the P2P tower, and holds 3 human gates.
Accountable person
Director, Demand Planning
Sub-function
Demand Planning
Shared spine tower
p2p
Hand-over points
None — this service stays inside its function

Other services in this sub-function

2 alongside this one

What this page is and is not

This is a catalogue of the modeled estate.