Forecast item at adjust within band
Farrah Nakamura
Supply Chain · Demand Planning · SC1B Demand Signal Response
$75k
value
85%
confidence
13
people affected
3h 55m
age
3h 49m
sla
75%
progress
Currently held by
P2P spine
Running in the shared AI GBS spine
Raised by
Maeve Whitfield
Requester of record
At station
Adjust within band
AI GBS layer · station 3 of 4
Where this train is on the line
Evidence trail
Every station this unit has passed, who acted, and what they left behind
This is the readable trail. The same actions are held in the append-only evidence spine with their authority grant, version stamps and hash links; open the auditor pack to see them.
Cleared detect deviation
-235mStatistical Forecast Agent
Spine control pack posted, three-way evidence attached
Cleared diagnose
-157mPromotion Lift Agent
Inputs, rule version and output hash written to the evidence log
Holding at adjust within band
-78mStatistical Forecast Agent
Spine control pack posted, three-way evidence attached
What happens next
The next station and its rule
Escalate outside band
run by Director, Demand Planning · Policy layer
Held for a named human when the unit exceeds the forecast item decision envelope, when confidence falls below the floor, or when a policy clause is engaged.
approver Director, Demand Planning
Why the signal is what it is
Plain reading of the current state
Green. The agent completed this station inside its authority envelope, the confidence threshold was met, and no gate rule was triggered. Nobody was asked to look at it.
Past SLA by 6m · 13 people or records downstream of this decision