Debt item at escalate holdout
Beatriz Delgado
Engineering · Technical Debt · EN8B Deprecation Campaign
$48k
value
87%
confidence
8
people affected
11h 43m
age
9h 26m
sla
80%
progress
Currently held by
Debt Detection Agent
An agent owns the next move
Raised by
Ines Haddad
Requester of record
At station
Escalate holdout
Policy layer · station 4 of 5
Where this train is on the line
Evidence trail
Every station this unit has passed, who acted, and what they left behind
This is the readable trail. more
Cleared identify usage
-703mTechnical Debt Orchestrator
Spine control pack posted, three-way evidence attached
Cleared notify owners
-527mDebt Detection Agent
Spine control pack posted, three-way evidence attached
Cleared migrate
-352mRisk Scoring Agent
Spine control pack posted, three-way evidence attached
Holding at escalate holdout
-176mDirector, Engineering Effectiveness
Inputs, rule version and output hash written to the evidence log
What happens next
The next station and its rule
Remove
run by Migration Agent · AI GBS layer
No gate here. The agent clears this station inside its envelope and posts evidence.
Handed to the AI GBS depot
Why the signal is what it is
Derived from time against commitment, not from the state
Amber. Either this item is at or past the time it was committed to and is not material enough to escalate, or it is inside the time but has burned three quarters of it while carrying high or critical materiality. Amber says nothing about who holds it: an item can be amber and moving normally through an agent.
Past SLA by 2h 17m · 8 people or records downstream of this decision