Release at assemble evidence
Grace Kaplan
Engineering · Release & Deployment · EN6C Release Readiness
$9k
value
96%
confidence
7
people affected
6h 36m
age
4h 24m
sla
67%
progress
Currently held by
IT spine
Running in the shared AI GBS spine
Raised by
Hannah Novak
Requester of record
At station
Assemble evidence
AI GBS layer · station 2 of 3
Where this train is on the line
Evidence trail
Every station this unit has passed, who acted, and what they left behind
This is the readable trail. The same actions are held in the append-only evidence spine with their authority grant, version stamps and hash links; open the auditor pack to see them.
Cleared check gates
-396mRelease Note Agent
Spine control pack posted, three-way evidence attached
Holding at assemble evidence
-198mRelease Note Agent
Spine control pack posted, three-way evidence attached
What happens next
The next station and its rule
Release manager sign
run by Director, Release Engineering · Policy layer
Held for a named human when the unit exceeds the release decision envelope, when confidence falls below the floor, or when a policy clause is engaged.
approver Director, Release Engineering
Why the signal is what it is
Plain reading of the current state
Green. The agent completed this station inside its authority envelope, the confidence threshold was met, and no gate rule was triggered. Nobody was asked to look at it.
Past SLA by 2h 12m · 7 people or records downstream of this decision