Release at promote
Zara Nakamura
Engineering · Release & Deployment · EN6A Production Release
$18k
value
88%
confidence
25
people affected
3h 54m
age
3h 24m
sla
86%
progress
Currently held by
IT spine
Running in the shared AI GBS spine
Raised by
Victor Kowalski
Requester of record
At station
Promote
AI GBS layer · station 6 of 7
Where this train is on the line
Evidence trail
Every station this unit has passed, who acted, and what they left behind
This is the readable trail. The same actions are held in the append-only evidence spine with their authority grant, version stamps and hash links; open the auditor pack to see them.
Cleared score risk
-234mChange Risk Agent
Inputs, rule version and output hash written to the evidence log
Cleared change board approve
-187mDirector, Release Engineering
Approval recorded with rationale and policy clause cited
Cleared deploy canary
-140mRelease Note Agent
Spine control pack posted, three-way evidence attached
Cleared analyze
-94mRelease Note Agent
Spine control pack posted, three-way evidence attached
Holding at promote
-47mRelease Note Agent
Spine control pack posted, three-way evidence attached
What happens next
The next station and its rule
Verify
run by Release Note Agent · AI GBS layer
No gate here. The agent clears this station inside its envelope and posts evidence.
Handed to the AI GBS depot
Why the signal is what it is
Plain reading of the current state
Green. The agent completed this station inside its authority envelope, the confidence threshold was met, and no gate rule was triggered. Nobody was asked to look at it.
Past SLA by 30m · 25 people or records downstream of this decision