Change at owner review
Sofia Duarte
Engineering · Build · EN3C Documentation Sync
$10k
value
64%
confidence
397
people affected
1h 59m
age
6h 45m
sla
75%
progress
Currently held by
Director, Platform Engineering
A person owns the next move
Raised by
Anika Tanaka
Requester of record
At station
Owner review
Policy layer · station 3 of 4
Where this train is on the line
Evidence trail
Every station this unit has passed, who acted, and what they left behind
This is the readable trail. more
Cleared detect drift
-119mBuild Orchestrator
Spine control pack posted, three-way evidence attached
Cleared regenerate
-79mSpecification Agent
Spine control pack posted, three-way evidence attached
Holding at owner review
-40mDirector, Platform Engineering
Inputs, rule version and output hash written to the evidence log
What happens next
The next station and its rule
Publish
run by Scaffold Agent · AI GBS layer
No gate here. The agent clears this station inside its envelope and posts evidence.
Handed to the AI GBS depot
Why the signal is what it is
Derived from time against commitment, not from the state
Green. This item is still inside the time it was committed to, and it is not close enough to that line for its materiality to pull it forward. Green says nothing about who holds it: an item can be green and sitting with a person.