Change at open pull request
Ines Novak
Engineering · Build · EN3A Feature Build
$2k
value
49%
confidence
192
people affected
44m
age
1h 20m
sla
67%
progress
Currently held by
Director, Platform Engineering
A person owns the next move
Raised by
Marcus Farouk
Requester of record
At station
Open pull request
AI GBS layer · station 4 of 6
Where this train is on the line
Evidence trail
Every station this unit has passed, who acted, and what they left behind
This is the readable trail. more
Cleared refine specification
-44mSpecification Agent
Inputs, rule version and output hash written to the evidence log
Cleared generate code
-33mSpecification Agent
Spine control pack posted, three-way evidence attached
Cleared self-test
-22mCode Generation Agent
Spine control pack posted, three-way evidence attached
Holding at open pull request
-11mScaffold Agent
Spine control pack posted, three-way evidence attached
What happens next
The next station and its rule
Human review
run by Director, Platform Engineering · Policy layer
Held for a named human when the unit exceeds the change decision envelope, when confidence falls below the floor, or when a policy clause is engaged.
approver Director, Platform Engineering
Why the signal is what it is
Derived from time against commitment, not from the state
Green. This item is still inside the time it was committed to, and it is not close enough to that line for its materiality to pull it forward. Green says nothing about who holds it: an item can be green and sitting with a person.