Change at merge
Priya Petrov
Engineering · Build · EN3A Feature Build
$79k
value
98%
confidence
13
people affected
4h 48m
age
7h 3m
sla
100%
progress
Currently held by
Documentation Agent
An agent owns the next move
Raised by
Maeve Nakamura
Requester of record
At station
Merge
Policy layer · station 6 of 6
Where this train is on the line
Evidence trail
Every station this unit has passed, who acted, and what they left behind
This is the readable trail. The same actions are held in the append-only evidence spine with their authority grant, version stamps and hash links; open the auditor pack to see them.
Cleared generate code
-288mSpecification Agent
Spine control pack posted, three-way evidence attached
Cleared self-test
-230mCode Generation Agent
Spine control pack posted, three-way evidence attached
Cleared open pull request
-173mScaffold Agent
Spine control pack posted, three-way evidence attached
Cleared human review
-115mDirector, Platform Engineering
Approval recorded with rationale and policy clause cited
Holding at merge
-58mDirector, Platform Engineering
Inputs, rule version and output hash written to the evidence log
What happens next
The next station and its rule
This is the last station. Once it clears, the unit closes and the outcome is booked.
Why the signal is what it is
Plain reading of the current state
Green. The agent completed this station inside its authority envelope, the confidence threshold was met, and no gate rule was triggered. Nobody was asked to look at it.