Design decision at frame
Ines Duarte
Engineering · Architecture & Design · EN2C Architecture Strategy Position
$8m
value
96%
confidence
36
people affected
14h 43m
age
1d 15h
sla
20%
progress
Currently held by
Architecture Strategy Agent
An agent owns the next move
Raised by
Elena Duarte
Requester of record
At station
Frame
Strategy layer · station 1 of 5
Where this train is on the line
Evidence trail
Every station this unit has passed, who acted, and what they left behind
This is the readable trail. more
Holding at frame
-883mDesign Option Agent
Inputs, rule version and output hash written to the evidence log
What happens next
The next station and its rule
Model options
run by Pattern Compliance Agent · Strategy layer
No gate here. The agent clears this station inside its envelope and posts evidence.
Why the signal is what it is
Derived from time against commitment, not from the state
Green. This item is still inside the time it was committed to, and it is not close enough to that line for its materiality to pull it forward. Green says nothing about who holds it: an item can be green and sitting with a person.