Zoom 3 of 3 — line
Threat Model Review
Judgment line · Engineering · Security Engineering
Runs when: Runs judgment. Starts when a break condition on a live position fires.
3
units a week
52%
touchless
6
stations
27.3d
timetable
29.5d
actual
+8%
vs timetable
Station walk
Every stage, who owns it, and what is sitting there
Each station names the agent that runs it and the layer it belongs to. more
- 01
Frame system
Strategyrun by Vulnerability Scanning Agent
dwell 2726msla 3219mqueued 23 - 02
Model threats
Strategyrun by Dependency Risk Agent
dwell 2421msla 4641mqueued 36 - 03
Rank
Strategyrun by Secret Detection Agent
dwell 3910msla 8025mqueued 26 - 04
Draft mitigations
Strategyrun by Threat Modeling Agent
dwell 4156msla 5068mqueued 45 - 05
Challenge
Strategyrun by Patch Orchestration Agent
dwell 1432msla 2006mqueued 29 - 06
Security lead ratify
Policyrun by Director, Security Engineering
Gate: Held for a named human when the unit exceeds the finding decision envelope, when confidence falls below the floor, or when a policy clause is engaged.
approver Director, Security Engineering
dwell 4932msla 5794mqueued 8
Live trains on this line
2 units in motion right now
| Ref | Work | Held by | Value | Status | Age / SLA |
|---|---|---|---|---|---|
| EN10C-1002 | Finding at draft mitigations Hiro Muller | Security Engineering Orchestrator agent | $24m | Evidence posted | 3d 20h / 3d 12h |
| EN10C-1008 | Finding at frame system Oscar Delgado | Dependency Risk Agent agent | $2.8m | Evidence posted | 1d 21h / 2d 5h |