LensReading which lens this session carries.
The catalogueSupply ChainSales & Operations PlanningAnalytical

Service SC3B

Scenario Stress Test

Runs analytical. Starts when a leader asks the question. It runs 15 times a week across 4 stations. One of those stations stops for a person and 3 are done by an agent, none of them on the shared spine.

Runs a week

15

55 in flight right now.

Stations

4

1 person · 3 agent · 0 spine

Agent share of steps

75%

Autonomy on this service is set at 43% against a ceiling of 72%.

Decisions a person makes

1

Held by VP Integrated Business Planning.

Touchless

55%

Share of runs that complete without anybody opening them.

Timetable against actual

158.6h

Actual 174.7h, 16.1h over the timetable.

Operations

The lane diagram

Read it left to right.

Person1 station and 46% of the dwellAgent3 stations and 54% of the dwellShared spine0 stations and 0% of the dwell1 crossing between lanes
Human
decides
Agent
does the work
GBS
shared spine
System
attributed by rule
Enterprise Data Warehouse
Group ERP — Materials and Inventory
Supply and Demand Planning
Group ERP — Materials and Inventory
Click any station to see who does it, what it costs in time, the rule that gates it and the system attributed to it.

Operations

Every station in order

The same stations as a list, with the dwell the estate records against each one and the system a station of that shape would touch.

#StationLaneWhoLayerDwellTargetIn flightSystem
1

Define scenario

AgentScenario Modeling Agentworkflow2h 31m5h 43m16Enterprise Data Warehouse
2

Model impact

AgentGap Analysis Agentworkflow10h 9m15h 26m2Group ERP — Materials and Inventory
3

Draft findings

AgentFinancial Reconciliation Agentworkflow11h 38m20h 9m37Supply and Demand Planning
4

Leader review

Held for a named human when the unit exceeds the planning cycle decision envelope, when confidence falls below the floor, or when a policy clause is engaged.

HumanVP Integrated Business Planningpolicy20h 34m42h 28m0Group ERP — Materials and Inventory

Operations

Run it

Change the volume, move the autonomy line, release a gate, and watch what happens to the hours in each lane and to the time it takes one run to get through.

Move something
Demand100%
15 a week is what the estate records.
Decisions handed to agents0 of 0
This service has at most one gate, so there is nothing to hand over without removing the last human decision.
People on the gates9 people
Each one is assumed to have 2,100 productive minutes a week, which is 35 hours.
Agent speed100%
100% is the dwell the estate records today.
Person time a week
308.5h
15 items at 1,234 minutes of decision each.
Agent time a week
364.5h
1,458 minutes an item, which does not compete for a person.
Gate load
98%
Inside capacity, with 6.5h of headroom.
Stations without a person
75%
1 gate left on 4 stations.
Where an item spends its time
46% waiting on a person
54% in the agent lane
An item now takes 2,692 minutes of worked time end to end against 2,692 in the recorded estate, a change of +0%. This is worked time, not calendar time: nothing here models a queue or a weekend.
What this model is, on Scenario Stress Test

The simulation is arithmetic on the estate, not a queueing model.

How it runs

Run it again, going wrong

The same unit and the same stations, broken the way the estate already records breaking.

4 stations, walked twice

Once clean, once with the categories the estate counts

This is the same unit on the same stations, breaking.

No break below was chosen.

One play head, two tracks, the same scale. The clean run stops when it runs out of stations; the other one keeps going.

As written

4 stations, nothing waiting, nothing sent back

0 min of 45 hrs

now Define scenario · Scenario Modeling Agent · 2.5 hrs

As the ledger has it

the same stations, plus 3 categories the estate already counts

0 min of 2.1 days

now Define scenario · Scenario Modeling Agent · 2.5 hrs

personagentshared spinework the break addsnobody working it

What breaks, and where it is counted

No break below was chosen.

What the two runs say together

3 counted categories land on this procedure.

What this run cannot claim

These breaks are shown together on one unit so the shape of a bad day fits on one screen.

Two clocks run. Worked time is the sum of the time the work is actually being done …

Live observability

Systems this service would touch

Attributed by rule from the function's system list.

3 systems attributed

0 of 3 returning records

Group ERP — Materials and Inventory

SAP S/4HANA MM · supply · bidirectional · high

modeled

2 of 4 stations attributed here · would write back

Enterprise Data Warehouse

Snowflake · analytics · inbound · critical

modeled

1 of 4 stations attributed here · read only

Supply and Demand Planning

Kinaxis RapidResponse · supply · bidirectional · high

modeled

1 of 4 stations attributed here · would write back

System attribution is a rule, not a reading.

Who runs it

Orchestration and accountability

Orchestrated by
Integrated Planning Orchestrator
That orchestrator’s remit
Owns planning cycle work end to end inside Supply Chain. Runs 3 lines across 17 stations, drains the repeatable share into the P2P tower, and holds 4 human gates.
Accountable person
VP Integrated Business Planning
Sub-function
Sales & Operations Planning
Shared spine tower
Not on the shared spine
Hand-over points
None — this service stays inside its function

Other services in this sub-function

2 alongside this one

What this page is and is not

This is a catalogue of the modeled estate.