LensReading which lens this session carries.
The catalogueResearch & DevelopmentPrototype & PilotAnalytical

Service RD6C

Scale Readiness Assessment

Runs analytical. Starts when the reporting period closes. It runs 12 times a week across 4 stations. One of those stations stops for a person and 3 are done by an agent, none of them on the shared spine.

Runs a week

12

115 in flight right now.

Stations

4

1 person · 3 agent · 0 spine

Agent share of steps

75%

Autonomy on this service is set at 76% against a ceiling of 76%.

Decisions a person makes

1

Held by Director, Product Development.

Touchless

49%

Share of runs that complete without anybody opening them.

Timetable against actual

49.0h

Actual 50.9h, 1.9h over the timetable.

Operations

The lane diagram

Read it left to right.

Person1 station and 47% of the dwellAgent3 stations and 53% of the dwellShared spine0 stations and 0% of the dwell1 crossing between lanes
Human
decides
Agent
does the work
GBS
shared spine
System
attributed by rule
Product Lifecycle Management
Research Notebook and Experiment Data
Product Lifecycle Management
Product Lifecycle Management
Click any station to see who does it, what it costs in time, the rule that gates it and the system attributed to it.

Operations

Every station in order

The same stations as a list, with the dwell the estate records against each one and the system a station of that shape would touch.

#StationLaneWhoLayerDwellTargetIn flightSystem
1

Score readiness

AgentBuild Planning Agentworkflow5h 19m9h 28m29Product Lifecycle Management
2

Identify gaps

AgentTest Plan Agentworkflow1h 44m2h 5m41Research Notebook and Experiment Data
3

Draft plan

AgentIteration Tracking Agentworkflow14h 4m33h 19m36Product Lifecycle Management
4

Leader review

Held for a named human when the unit exceeds the prototype decision envelope, when confidence falls below the floor, or when a policy clause is engaged.

HumanDirector, Product Developmentpolicy18h 52m23h 59m9Product Lifecycle Management

Operations

Run it

Change the volume, move the autonomy line, release a gate, and watch what happens to the hours in each lane and to the time it takes one run to get through.

Move something
Demand100%
12 a week is what the estate records.
Decisions handed to agents0 of 0
This service has at most one gate, so there is nothing to hand over without removing the last human decision.
People on the gates7 people
Each one is assumed to have 2,100 productive minutes a week, which is 35 hours.
Agent speed100%
100% is the dwell the estate records today.
Person time a week
226.4h
12 items at 1,132 minutes of decision each.
Agent time a week
253.4h
1,267 minutes an item, which does not compete for a person.
Gate load
92%
Inside capacity, with 18.6h of headroom.
Stations without a person
75%
1 gate left on 4 stations.
Where an item spends its time
47% waiting on a person
53% in the agent lane
An item now takes 2,399 minutes of worked time end to end against 2,399 in the recorded estate, a change of +0%. This is worked time, not calendar time: nothing here models a queue or a weekend.
What this model is, on Scale Readiness Assessment

The simulation is arithmetic on the estate, not a queueing model.

How it runs

Run it again, going wrong

The same unit and the same stations, broken the way the estate already records breaking.

4 stations, walked twice

Once clean, once with the categories the estate counts

This is the same unit on the same stations, breaking.

No break below was chosen.

One play head, two tracks, the same scale. The clean run stops when it runs out of stations; the other one keeps going.

As written

4 stations, nothing waiting, nothing sent back

0 min of 40 hrs

now Score readiness · Build Planning Agent · 5.3 hrs

As the ledger has it

the same stations, plus 3 categories the estate already counts

0 min of 45 hrs

now Score readiness · Build Planning Agent · 5.3 hrs

personagentshared spinework the break addsnobody working it

What breaks, and where it is counted

No break below was chosen.

What the two runs say together

3 counted categories land on this procedure.

What this run cannot claim

These breaks are shown together on one unit so the shape of a bad day fits on one screen.

Two clocks run. Worked time is the sum of the time the work is actually being done …

Live observability

Systems this service would touch

Attributed by rule from the function's system list.

2 systems attributed

0 of 2 returning records

Product Lifecycle Management

Siemens Teamcenter · engineering · inbound · high

modeled

3 of 4 stations attributed here · read only

Research Notebook and Experiment Data

Benchling · engineering · inbound · medium

not-connected

1 of 4 stations attributed here · read only

System attribution is a rule, not a reading.

Who runs it

Orchestration and accountability

Orchestrated by
Prototype Orchestrator
That orchestrator’s remit
Owns prototype work end to end inside Research & Development. Runs 3 lines across 17 stations, drains the repeatable share into the C2L tower, and holds 4 human gates.
Accountable person
Director, Product Development
Sub-function
Prototype & Pilot
Shared spine tower
Not on the shared spine
Hand-over points
None — this service stays inside its function

Other services in this sub-function

2 alongside this one

What this page is and is not

This is a catalogue of the modeled estate.