Service RD2A

Stage Gate Review

Runs transactional. Starts when a threshold is crossed. It runs 5,106 times a week across 6 stations. 2 of those stations stop for a person and 4 are done by an agent, 1 of them on the shared spine.

Runs a week

5,106

70 in flight right now.

Stations

6

2 person · 3 agent · 1 spine

Agent share of steps

67%

Autonomy on this service is set at 58% against a ceiling of 64%.

Decisions a person makes

2

Held by VP Innovation.

Touchless

67%

Share of runs that complete without anybody opening them.

Timetable against actual

12.0h

Actual 11.8h, 0.2h under the timetable.

Operations

The lane diagram

Read it left to right.

Person2 stations and 69% of the dwellAgent3 stations and 19% of the dwellShared spine1 station and 12% of the dwell3 crossings between lanes
Human
decides
Agent
does the work
GBS
shared spine
System
attributed by rule
Product Lifecycle Management
Product Lifecycle Management
Research Notebook and Experiment Data
Product Lifecycle Management
Product Lifecycle Management
Product Lifecycle Management
Click any station to see who does it, what it costs in time, the rule that gates it and the system attributed to it.

Operations

Every station in order

The same stations as a list, with the dwell the estate records against each one and the system a station of that shape would touch.

#StationLaneWhoLayerDwellTargetIn flightSystem
1

Assemble evidence

GBSInnovation Portfolio Orchestratorgbs2h 8m3h 17m19Product Lifecycle Management
2

Score against criteria

AgentStage Gate Agentworkflow1h 3m2h 20m16Product Lifecycle Management
3

Draft recommendation

AgentPortfolio Balance Agentworkflow1h 55m4h 2m24Research Notebook and Experiment Data
4

Gate committee decide

Held for a named human when the unit exceeds the program decision envelope, when confidence falls below the floor, or when a policy clause is engaged.

HumanVP Innovationpolicy2h 6m4h 56m1Product Lifecycle Management
5

Fund or stop

Held for a named human when the unit exceeds the program decision envelope, when confidence falls below the floor, or when a policy clause is engaged.

HumanVP Innovationpolicy10h 18m24h6Product Lifecycle Management
6

Communicate

AgentPortfolio Bets Agentworkflow32m44m4Product Lifecycle Management

Operations

Run it

Change the volume, move the autonomy line, release a gate, and watch what happens to the hours in each lane and to the time it takes one run to get through.

Move something
Demand100%
5,106 a week is what the estate records.
Decisions handed to agents0 of 2
Cheapest decision first. The last gate never moves: something on this service always ends with a person.
People on the gates1809 people
Each one is assumed to have 2,100 productive minutes a week, which is 35 hours.
Agent speed100%
100% is the dwell the estate records today.
Person time a week
63,314.4h
5,106 items at 744 minutes of decision each.
Agent time a week
28,763.8h
338 minutes an item, which does not compete for a person.
Gate load
100%
Inside capacity, with 0.6h of headroom.
Stations without a person
67%
2 gates left on 6 stations.
Where an item spends its time
69% waiting on a person
31% in the agent lane
An item now takes 1,082 minutes of worked time end to end against 1,082 in the recorded estate, a change of +0%. This is worked time, not calendar time: nothing here models a queue or a weekend.
What this model is, on Stage Gate Review

The simulation is arithmetic on the estate, not a queueing model.

How it runs

Run it again, going wrong

The same unit and the same stations, broken the way the estate already records breaking.

6 stations, walked twice

Once clean, once with the categories the estate counts

This is the same unit on the same stations, breaking.

No break below was chosen.

One play head, two tracks, the same scale. The clean run stops when it runs out of stations; the other one keeps going.

As written

6 stations, nothing waiting, nothing sent back

0 min of 18 hrs

now Assemble evidence · Innovation Portfolio Orchestrator · 2.1 hrs

As the ledger has it

the same stations, plus 5 categories the estate already counts

0 min of 45 hrs

now Assemble evidence · Innovation Portfolio Orchestrator · 2.1 hrs

personagentshared spinework the break addsnobody working it

What breaks, and where it is counted

No break below was chosen.

What the two runs say together

5 counted categories land on this procedure.

What this run cannot claim

These breaks are shown together on one unit so the shape of a bad day fits on one screen.

The separation register records a duty conflict against a sub-function and a named post, not against one procedure.

Two clocks run. Worked time is the sum of the time the work is actually being done …

Live observability

Systems this service would touch

Attributed by rule from the function's system list.

2 systems attributed

0 of 2 returning records

Product Lifecycle Management

Siemens Teamcenter · engineering · inbound · high

modeled

5 of 6 stations attributed here · read only

Research Notebook and Experiment Data

Benchling · engineering · inbound · medium

not-connected

1 of 6 stations attributed here · read only

System attribution is a rule, not a reading.

Who runs it

Orchestration and accountability

Orchestrated by
Innovation Portfolio Orchestrator
That orchestrator’s remit
Owns program work end to end inside Research & Development. Runs 3 lines across 16 stations, drains the repeatable share into no shared tower, and holds 4 human gates.
Accountable person
VP Innovation
Sub-function
Innovation Portfolio
Shared spine tower
Not on the shared spine
Hand-over points
None — this service stays inside its function

Other services in this sub-function

2 alongside this one

What this page is and is not

This is a catalogue of the modeled estate.