LensReading which lens this session carries.
The catalogueEngineeringTechnical DebtTransactional

Service EN8B

Deprecation Campaign

Runs transactional. Starts when a request lands in the queue. It runs 4,772 times a week across 5 stations. One of those stations stops for a person and 4 are done by an agent, 4 of them on the shared spine.

Runs a week

4,772

64 in flight right now.

Stations

5

1 person · 0 agent · 4 spine

Agent share of steps

80%

Autonomy on this service is set at 71% against a ceiling of 84%.

Decisions a person makes

1

Held by Director, Engineering Effectiveness.

Touchless

82%

Share of runs that complete without anybody opening them.

Timetable against actual

6.1h

Actual 7.3h, 1.2h over the timetable.

Operations

The lane diagram

Read it left to right.

Person1 station and 53% of the dwellAgent0 stations and 0% of the dwellShared spine4 stations and 47% of the dwell2 crossings between lanes
Human
decides
Agent
does the work
GBS
shared spine
System
attributed by rule
Group ERP — Materials and Inventory
Group ERP — Materials and Inventory
Group ERP — Materials and Inventory
Group ERP — Materials and Inventory
Group ERP — Materials and Inventory
Click any station to see who does it, what it costs in time, the rule that gates it and the system attributed to it.

Operations

Every station in order

The same stations as a list, with the dwell the estate records against each one and the system a station of that shape would touch.

#StationLaneWhoLayerDwellTargetIn flightSystem
1

Identify usage

GBSTechnical Debt Orchestratorgbs1h 38m2h 58m16Group ERP — Materials and Inventory
2

Notify owners

GBSDebt Detection Agentgbs1h 41m3h 39m31Group ERP — Materials and Inventory
3

Migrate

GBSRisk Scoring Agentgbs25m59m2Group ERP — Materials and Inventory
4

Escalate holdout

Held for a named human when the unit exceeds the debt item decision envelope, when confidence falls below the floor, or when a policy clause is engaged.

HumanDirector, Engineering Effectivenesspolicy6h 41m9h 26m9Group ERP — Materials and Inventory
5

Remove

GBSMigration Agentgbs2h 7m2h 30m6Group ERP — Materials and Inventory

Operations

Run it

Change the volume, move the autonomy line, release a gate, and watch what happens to the hours in each lane and to the time it takes one run to get through.

Move something
Demand100%
4,772 a week is what the estate records.
Decisions handed to agents0 of 0
This service has at most one gate, so there is nothing to hand over without removing the last human decision.
People on the gates912 people
Each one is assumed to have 2,100 productive minutes a week, which is 35 hours.
Agent speed100%
100% is the dwell the estate records today.
Person time a week
31,892.9h
4,772 items at 401 minutes of decision each.
Agent time a week
27,916.2h
351 minutes an item, which does not compete for a person.
Gate load
100%
Inside capacity, with 27.1h of headroom.
Stations without a person
80%
1 gate left on 5 stations.
Where an item spends its time
53% waiting on a person
47% in the agent lane
An item now takes 752 minutes of worked time end to end against 752 in the recorded estate, a change of +0%. This is worked time, not calendar time: nothing here models a queue or a weekend.
What this model is, on Deprecation Campaign

The simulation is arithmetic on the estate, not a queueing model.

How it runs

Run it again, going wrong

The same unit and the same stations, broken the way the estate already records breaking.

5 stations, walked twice

Once clean, once with the categories the estate counts

This is the same unit on the same stations, breaking.

No break below was chosen.

One play head, two tracks, the same scale. The clean run stops when it runs out of stations; the other one keeps going.

As written

5 stations, nothing waiting, nothing sent back

0 min of 13 hrs

now Identify usage · Technical Debt Orchestrator · 1.6 hrs

As the ledger has it

the same stations, plus 3 categories the estate already counts

0 min of 18 hrs

now Identify usage · Technical Debt Orchestrator · 1.6 hrs

personagentshared spinework the break addsnobody working it

What breaks, and where it is counted

No break below was chosen.

What the two runs say together

3 counted categories land on this procedure.

What this run cannot claim

These breaks are shown together on one unit so the shape of a bad day fits on one screen.

Two clocks run. Worked time is the sum of the time the work is actually being done …

Live observability

Systems this service would touch

Attributed by rule from the function's system list.

1 systems attributed

0 of 1 returning records

Group ERP — Materials and Inventory

SAP S/4HANA MM · supply · bidirectional · high

modeled

5 of 5 stations attributed here · would write back

System attribution is a rule, not a reading.

Who runs it

Orchestration and accountability

Orchestrated by
Technical Debt Orchestrator
That orchestrator’s remit
Owns debt item work end to end inside Engineering. Runs 3 lines across 16 stations, drains the repeatable share into no shared tower, and holds 3 human gates.
Accountable person
Director, Engineering Effectiveness
Sub-function
Technical Debt
Shared spine tower
Not on the shared spine
Hand-over points
None — this service stays inside its function

Other services in this sub-function

2 alongside this one

What this page is and is not

This is a catalogue of the modeled estate.