Service EN2C
Architecture Strategy Position
Runs judgment. Starts when the annual doctrine review opens. It runs 2 times a week across 5 stations. One of those stations stops for a person and 4 are done by an agent, none of them on the shared spine.
Runs a week
2
110 in flight right now.
Stations
5
1 person · 4 agent · 0 spine
Agent share of steps
80%
Autonomy on this service is set at 66% against a ceiling of 70%.
Decisions a person makes
1
Held by Chief Architect.
Touchless
34%
Share of runs that complete without anybody opening them.
Timetable against actual
281.2h
Actual 306.4h, 25.2h over the timetable.
Operations
The lane diagram
Read it left to right. more
Operations
Every station in order
The same stations as a list, with the dwell the estate records against each one and the system a station of that shape would touch.
| # | Station | Lane | Who | Layer | Dwell | Target | In flight | System |
|---|---|---|---|---|---|---|---|---|
| 1 | Frame | Agent | Design Option Agent | strategy | 19h 20m | 39h 42m | 34 | Group ERP — Materials and Inventory |
| 2 | Model options | Agent | Pattern Compliance Agent | strategy | 10h 51m | 17h 54m | 24 | Group ERP — Materials and Inventory |
| 3 | Draft position | Agent | Non-functional Requirements Agent | strategy | 13h 2m | 27h 26m | 31 | Group ERP — Materials and Inventory |
| 4 | Challenge | Agent | Cost Modeling Agent | strategy | 36h 32m | 47h | 16 | Group ERP — Materials and Inventory |
| 5 | CTO ratify Held for a named human when the unit exceeds the design decision decision envelope, when confidence falls below the floor, or when a policy clause is engaged. | Human | Chief Architect | policy | 92h 15m | 200h 47m | 5 | Group ERP — Materials and Inventory |
Operations
Run it
Change the volume, move the autonomy line, release a gate, and watch what happens to the hours in each lane and to the time it takes one run to get through. more
The simulation is arithmetic on the estate, not a queueing model. more
How it runs
Run it again, going wrong
The same unit and the same stations, broken the way the estate already records breaking. more
5 stations, walked twice
Once clean, once with the categories the estate counts
This is the same unit on the same stations, breaking. more
No break below was chosen. more
One play head, two tracks, the same scale. The clean run stops when it runs out of stations; the other one keeps going.
As written
5 stations, nothing waiting, nothing sent back
0 min of 7.2 days
now Frame · Design Option Agent · 19 hrs
As the ledger has it
the same stations, plus 3 categories the estate already counts
0 min of 7.4 days
now Frame · Design Option Agent · 19 hrs
What breaks, and where it is counted
No break below was chosen. more
What the two runs say together
3 counted categories land on this procedure. more
What this run cannot claim
These breaks are shown together on one unit so the shape of a bad day fits on one screen. more
Two clocks run. Worked time is the sum of the time the work is actually being done … more
Live observability
Systems this service would touch
Attributed by rule from the function's system list. more
1 systems attributed
0 of 1 returning records
Group ERP — Materials and Inventory
SAP S/4HANA MM · supply · bidirectional · high
5 of 5 stations attributed here · would write back
System attribution is a rule, not a reading. more
Who runs it
Orchestration and accountability
- Orchestrated by
- Architecture Orchestrator
- That orchestrator’s remit
- Owns design decision work end to end inside Engineering. Runs 3 lines across 17 stations, drains the repeatable share into no shared tower, and holds 3 human gates.
- Accountable person
- Chief Architect
- Sub-function
- Architecture & Design
- Shared spine tower
- Not on the shared spine
- Hand-over points
- None — this service stays inside its function
Other services in this sub-function
2 alongside this one
What this page is and is not
This is a catalogue of the modeled estate. more