LensReading which lens this session carries.

Prove · baseline BL-071

Sourcing & RFx

Sourcing & RFx, all regions, as run before the agents were switched on. Owner at the time of measurement: Director, Strategic Sourcing.

Baseline register
Status
Locked and signed
confidence 0.89
Cost per unit
$28.74
126,945 units in the window
Cycle time
31.6 hrs
pre-agent, measured end to end
Quality
93.0%
first-pass yield
Claimed on this baseline
$7.69m
$2.84m independently verified
Posted to the ledger
3 of 5
cash lines with a journal reference

How it was measured

Invoice reconstruction

Method
Invoice reconstruction
Method note
Vendor invoices, contractor timesheets and purchase orders re-added for the window and tied back to the posted ledger balance.
Window
FY25 Q1, thirteen weeks
Sample
3,808
Confidence in the method
0.89

Sign-off

Who accepted this as the number to beat

Status
Locked and signed
Signed by
Ravi Menon
Role
Finance Business Partner, Commercial
Signed
15.9 months ago
Caveat carried with the number
Locked and signed. The window is a full quarter and the method leaves an audit trail that can be re-performed.

Where the benefit lands

Account and cost center this baseline reconciles to

General ledger account
6500 · Outsourced services, shared centers
Managed-service fees for the shared towers. Volume-priced, so a throughput change moves this account within one billing cycle.
Corporate GL · Third party · owner Sofia Lindqvist, Finance Business Partner, Operations
Cost center
CC-2020 · Procurement
Global · owner Sofia Lindqvist · annual budget $17.60m
Procurement & Source-to-Payfunction viewEV-BL-071evidence chain

Benefit lines resting on this baseline

5 lines · $7.69m claimed · $5.70m realized · $2.84m verified

PeriodCategoryClaimedRealizedVerifiedStatusVarianceJournal
FY25 Q3Outsourced cost$990.1k$633.7k$513.3kPartly verified
Rate
The blended labor rate used in the claim sits above the rate actually charged to the cost center.
JV-2025Q3-0137
FY25 Q4Outsourced cost$1.44m$1.11m$996.5kPartly verified
Scope
Scope drifted after the baseline was signed. The added work is real but it is not this baseline.
JV-2025Q4-0138
FY26 Q1Outsourced cost$1.84m$1.64mnot verifiedNot verified
Volume
Seasonal volume ran ahead of baseline, which flatters the realized figure rather than the claim.
not posted
FY26 Q2Outsourced cost$2.19m$1.43m$1.33mPartly verified
Timing
Benefit landed one period later than claimed. The run rate is intact; the period attribution was wrong.
JV-2026Q2-0139
FY26 Q3Outsourced cost$1.23m$894.9knot verifiedPeriod open
Period open
The period is not closed. The realized figure is a run rate, not a result, and nothing in it has been verified.
not posted
What this record is, and what it is not

A benefit realization ledger reconciled to a general ledger needs the customer’s actual baseline figures and account structure. Modeled numbers demonstrate the instrument and prove nothing about the business case.

The measurement window ran FY25 Q1, thirteen weeks over a sample of 3,808. That sample size is on the page because a baseline drawn from twelve cases and one drawn from forty thousand are not the same instrument, and averaging them into a single confidence figure would hide which one you are looking at.

3 of 5 cash lines resting on this baseline carry a journal reference. A benefit line with no journal reference has not touched the general ledger, so it is shown as claimed rather than counted as realized cash.