LensReading which lens this session carries.

Prove · baseline BL-065

Contract Execution

Contract Execution, all regions, as run before the agents were switched on. Owner at the time of measurement: Director, Contract Management.

Baseline register
Status
Locked and signed
confidence 0.78
Cost per unit
$48.79
84,916 units in the window
Cycle time
16.9 hrs
pre-agent, measured end to end
Quality
86.2%
error rate at audit, inverted
Claimed on this baseline
$8.17m
$3.62m independently verified
Posted to the ledger
3 of 5
cash lines with a journal reference

How it was measured

Time and motion

Method
Time and motion
Method note
Observed task timing on a case sample, extrapolated to the population. Extrapolation error is carried, not removed.
Window
FY24 Q3, thirteen weeks
Sample
3,397
Confidence in the method
0.78

Sign-off

Who accepted this as the number to beat

Status
Locked and signed
Signed by
Marta Alvarez
Role
Cost Accounting Manager
Signed
21.1 months ago
Caveat carried with the number
Locked and signed, but the method carries extrapolation error that is not removed. Treat the figure as a range, not a point.

Where the benefit lands

Account and cost center this baseline reconciles to

General ledger account
6500 · Outsourced services, shared centers
Managed-service fees for the shared towers. Volume-priced, so a throughput change moves this account within one billing cycle.
Corporate GL · Third party · owner Sofia Lindqvist, Finance Business Partner, Operations
Cost center
CC-2020 · Procurement
Global · owner Sofia Lindqvist · annual budget $17.60m
Procurement & Source-to-Payfunction viewEV-BL-065evidence chain

Benefit lines resting on this baseline

5 lines · $8.17m claimed · $7.16m realized · $3.62m verified

PeriodCategoryClaimedRealizedVerifiedStatusVarianceJournal
FY25 Q3Outsourced cost$1.05m$789.9k$647.7kPartly verified
Scope
Scope drifted after the baseline was signed. The added work is real but it is not this baseline.
JV-2025Q3-0132
FY25 Q4Outsourced cost$1.53m$1.35m$1.22mPartly verified
Timing
Benefit landed one period later than claimed. The run rate is intact; the period attribution was wrong.
JV-2025Q4-0133
FY26 Q1Outsourced cost$1.96m$2.03m$1.75mPartly verified
Timing
Benefit landed one period later than claimed. The run rate is intact; the period attribution was wrong.
JV-2026Q1-0134
FY26 Q2Outsourced cost$2.33m$1.98mnot verifiedNot verified
Volume
Seasonal volume ran ahead of baseline, which flatters the realized figure rather than the claim.
not posted
FY26 Q3Outsourced cost$1.30m$1.00mnot verifiedPeriod open
Period open
The period is not closed. The realized figure is a run rate, not a result, and nothing in it has been verified.
not posted
What this record is, and what it is not

A benefit realization ledger reconciled to a general ledger needs the customer’s actual baseline figures and account structure. Modeled numbers demonstrate the instrument and prove nothing about the business case.

The measurement window ran FY24 Q3, thirteen weeks over a sample of 3,397. That sample size is on the page because a baseline drawn from twelve cases and one drawn from forty thousand are not the same instrument, and averaging them into a single confidence figure would hide which one you are looking at.

3 of 5 cash lines resting on this baseline carry a journal reference. A benefit line with no journal reference has not touched the general ledger, so it is shown as claimed rather than counted as realized cash.