LensReading which lens this session carries.

Prove · baseline BL-064

Release & Deployment

Release & Deployment, all regions, as run before the agents were switched on. Owner at the time of measurement: Director, Release Engineering.

Baseline register
Status
Locked and signed
confidence 0.80
Cost per unit
$20.91
182,819 units in the window
Cycle time
33.4 hrs
pre-agent, measured end to end
Quality
86.1%
rework rate, inverted
Claimed on this baseline
$8.45m
$1.74m independently verified
Posted to the ledger
2 of 5
cash lines with a journal reference

How it was measured

Invoice reconstruction

Method
Invoice reconstruction
Method note
Vendor invoices, contractor timesheets and purchase orders re-added for the window and tied back to the posted ledger balance.
Window
FY24 Q4, thirteen weeks
Sample
5,485
Confidence in the method
0.80

Sign-off

Who accepted this as the number to beat

Status
Locked and signed
Signed by
Marta Alvarez
Role
Cost Accounting Manager
Signed
19.1 months ago
Caveat carried with the number
Locked and signed. The window is a full quarter and the method leaves an audit trail that can be re-performed.

Where the benefit lands

Account and cost center this baseline reconciles to

General ledger account
6500 · Outsourced services, shared centers
Managed-service fees for the shared towers. Volume-priced, so a throughput change moves this account within one billing cycle.
Corporate GL · Third party · owner Sofia Lindqvist, Finance Business Partner, Operations
Cost center
CC-3010 · Engineering
Global · owner Daniel Okoye · annual budget $38.11m
Engineeringfunction viewEV-BL-064evidence chain

Benefit lines resting on this baseline

5 lines · $8.45m claimed · $6.88m realized · $1.74m verified

PeriodCategoryClaimedRealizedVerifiedStatusVarianceJournal
FY25 Q3Outsourced cost$1.09m$892.2k$740.5kPartly verified
Rate
The blended labor rate used in the claim sits above the rate actually charged to the cost center.
JV-2025Q3-0130
FY25 Q4Outsourced cost$1.58m$1.25m$998.7kPartly verified
Volume
Seasonal volume ran ahead of baseline, which flatters the realized figure rather than the claim.
JV-2025Q4-0131
FY26 Q1Outsourced cost$2.02m$1.52mnot verifiedNot verified
Unexplained
Internal audit could not trace part of the realized figure to a driver. The untraced amount stays in the variance column.
not posted
FY26 Q2Outsourced cost$2.41m$2.00mnot verifiedNot verified
Method mismatch
The baseline was measured by survey and the realized figure by system extract. The two are not comparable without a bridge, and no bridge has been built.
not posted
FY26 Q3Outsourced cost$1.35m$1.23mnot verifiedPeriod open
Period open
The period is not closed. The realized figure is a run rate, not a result, and nothing in it has been verified.
not posted
What this record is, and what it is not

A benefit realization ledger reconciled to a general ledger needs the customer’s actual baseline figures and account structure. Modeled numbers demonstrate the instrument and prove nothing about the business case.

The measurement window ran FY24 Q4, thirteen weeks over a sample of 5,485. That sample size is on the page because a baseline drawn from twelve cases and one drawn from forty thousand are not the same instrument, and averaging them into a single confidence figure would hide which one you are looking at.

2 of 5 cash lines resting on this baseline carry a journal reference. A benefit line with no journal reference has not touched the general ledger, so it is shown as claimed rather than counted as realized cash.