Campaign Orchestration, all regions, as run before the agents were switched on. Owner at the time of measurement: Director, Campaign Operations.

Baseline register
Status
Unsigned
confidence 0.86
Cost per unit
$29.03
238,550 units in the window
Cycle time
24.7 hrs
pre-agent, measured end to end
Quality
91.1%
rework rate, inverted
Claimed on this baseline
$13.75m
$0 independently verified
Posted to the ledger
0 of 5
cash lines with a journal reference

How it was measured

Invoice reconstruction

Method
Invoice reconstruction
Method note
Vendor invoices, contractor timesheets and purchase orders re-added for the window and tied back to the posted ledger balance.
Window
FY25 Q2, eight weeks, shortened
Sample
21,470
Confidence in the method
0.86

Sign-off

Who accepted this as the number to beat

Status
Unsigned
Signed by
nobody has signed this
Role
Signed
never
Caveat carried with the number
No signatory has accepted this measurement. It is recorded so the gap is visible, not so the number can be used.

Where the benefit lands

Account and cost center this baseline reconciles to

General ledger account
6500 · Outsourced services, shared centers
Managed-service fees for the shared towers. Volume-priced, so a throughput change moves this account within one billing cycle.
Corporate GL · Third party · owner Sofia Lindqvist, Finance Business Partner, Operations
Cost center
CC-1020 · Marketing
Global · owner Ravi Menon · annual budget $34.31m
Marketingfunction view

Benefit lines resting on this baseline

5 lines · $13.75m claimed · $11.69m realized · $0 verified

PeriodCategoryClaimedRealizedVerifiedStatusVarianceJournal
FY25 Q3Outsourced cost$1.77m$1.15mnot verifiedNot verified
Method mismatch
The baseline was measured by survey and the realized figure by system extract. The two are not comparable without a bridge, and no bridge has been built.
not posted
FY25 Q4Outsourced cost$2.57m$2.01mnot verifiedNot verified
Volume
Seasonal volume ran ahead of baseline, which flatters the realized figure rather than the claim.
not posted
FY26 Q1Outsourced cost$3.29m$2.53mnot verifiedNot verified
Volume
Seasonal volume ran ahead of baseline, which flatters the realized figure rather than the claim.
not posted
FY26 Q2Outsourced cost$3.92m$3.96mnot verifiedNot verified
Timing
Benefit landed one period later than claimed. The run rate is intact; the period attribution was wrong.
not posted
FY26 Q3Outsourced cost$2.19m$2.04mnot verifiedPeriod open
Period open
The period is not closed. The realized figure is a run rate, not a result, and nothing in it has been verified.
not posted
What this record is, and what it is not

A benefit realization ledger reconciled to a general ledger needs the customer’s actual baseline figures and account structure. Modeled numbers demonstrate the instrument and prove nothing about the business case.

The measurement window ran FY25 Q2, eight weeks, shortened over a sample of 21,470. That sample size is on the page because a baseline drawn from twelve cases and one drawn from forty thousand are not the same instrument, and averaging them into a single confidence figure would hide which one you are looking at.

0 of 5 cash lines resting on this baseline carry a journal reference. A benefit line with no journal reference has not touched the general ledger, so it is shown as claimed rather than counted as realized cash.