Network Study

Judgment procedure owned by Network Design in Supply Chain. 7 numbered steps, 1 of them a person deciding and 6 of them agent work …

Procedure code

SC10A

Judgment

Rule versions in force

v2.1 · v5.9

2 governing rules stacked over it

In force since

2025-12-22

Earliest effective date across those rules

Last reviewed

2026-06-30

Latest review date across those rules

Rules approved by

1

VP Supply Chain Strategy

Rule health

0/2

2 under review · 0 superseded

There is no document register behind this header. The version, the dates and the approver names are read off the governing rules this procedure runs inside, which is the closest thing the estate holds to a document control record. Nobody wrote these procedures. There is no document library behind this page and no Word file anywhere in the estate. Every procedure below is generated from rows this platform already holds: the line and its ordered stations, the owning team and the person accountable for it, the policy items bound to that team, and the governance gates seeded against the function. The steps, the owners, the gates, the approvers, the dwell times and the volumes are read straight off those rows. The sentences that join them together are generated. Read a procedure as the estate describing itself, not as a document somebody signed.

Purpose and scope

What this procedure is for and where it stops

To run network study to one repeatable standard inside Network Design, part of Supply Chain.

Entry condition

Runs judgment. Starts when the annual doctrine review opens.

Exit condition

The unit clears exco ratify, released by VP Supply Chain Strategy.

In scope

  • Every unit of network study raised inside Network Design, from the trigger below through to the final step.
  • 6 of the 7 steps, which run without a person present.
  • 1 decision that stops the line until a named person releases it.

Out of scope

  • Anything outside the envelope set by the owning team. It leaves the line at a gate and becomes the named approver's decision.
  • Work that belongs to another function. This line records no handoff, so nothing leaves it mid-flow.
  • Shared-spine work. This line has none; every step is done inside the function.

Who owns it

Runs the line

Network Design Orchestrator

Accountable person

VP Supply Chain Strategy

The end of the escalation path. Above them sits Supply Chain Chief of Staff for the function.

That team’s remit

Owns network study work end to end inside Supply Chain.

That remit describes the whole team, not this one procedure, so its counts are larger than the ones on this page.

Autonomy

56% now · ceiling 60%

Deliberately capped low. Network modeling is fully agentic, but opening or closing a facility is a capital decision with employment consequences that only a board can take.

The procedure, step by step

7 numbered steps · 1 of them stop for a person

A step is one station on the line.

No.StepWho does itWhat happensSystem of recordTime on the stepIn flight
01

Frame

Agentstrategy

Network Modeling Agent

Network Modeling Agent performs this step unattended at the strategy layer, inside the envelope its owning team has set, and writes an evidence record naming the actor, the authority it acted under and the digests of what it read and wrote.Enterprise Data Warehouse35.0 hrsstandard 2.4 days18
02

Model baseline

Agentstrategy

Cost-to-Serve Agent

Cost-to-Serve Agent performs this step unattended at the strategy layer, inside the envelope its owning team has set, and writes an evidence record naming the actor, the authority it acted under and the digests of what it read and wrote.Enterprise Data Warehouse2.5 daysstandard 3.6 days33
03

Model scenarios

Agentstrategy

Footprint Scenario Agent

Footprint Scenario Agent performs this step unattended at the strategy layer, inside the envelope its owning team has set, and writes an evidence record naming the actor, the authority it acted under and the digests of what it read and wrote.Enterprise Data Warehouse14.7 hrsstandard 27.8 hrs20
04

Cost and service trade-off

Agentstrategy

Service Level Modeling Agent

Service Level Modeling Agent performs this step unattended at the strategy layer, inside the envelope its owning team has set, and writes an evidence record naming the actor, the authority it acted under and the digests of what it read and wrote.Enterprise Data Warehouse37.5 hrsstandard 3.7 days42
05

Draft position

Agentstrategy

Carbon Modeling Agent

Carbon Modeling Agent performs this step unattended at the strategy layer, inside the envelope its owning team has set, and writes an evidence record naming the actor, the authority it acted under and the digests of what it read and wrote.Enterprise Data Warehouse16.5 hrsstandard 35.2 hrs23
06

Challenge

Agentstrategy

Network Strategy Agent

Network Strategy Agent performs this step unattended at the strategy layer, inside the envelope its owning team has set, and writes an evidence record naming the actor, the authority it acted under and the digests of what it read and wrote.Enterprise Data Warehouse29.6 hrsstandard 36.8 hrs10
07

ExCo ratify

HumanpolicyDecision

VP Supply Chain Strategy

Releases: VP Supply Chain Strategy

Work stops. VP Supply Chain Strategy reviews what the line has produced and either releases the unit or sends it back. Nothing downstream of this step runs until that decision is made.Holds until: Held for a named human when the unit exceeds the network study decision envelope, when confidence falls below the floor, or when a policy clause is engaged.Group ERP — Materials and Inventory41.7 hrsstandard 3.8 days0

The swimlane

The same steps, laid out by who is holding the work

Three lanes: a person deciding, an agent working, and the shared services spine.

Person1 station and 18% of the dwellAgent6 stations and 82% of the dwellShared spine0 stations and 0% of the dwell1 crossing between lanes
Human
decides
Agent
does the work
GBS
shared spine
System
attributed by rule
Enterprise Data Warehouse
Enterprise Data Warehouse
Enterprise Data Warehouse
Enterprise Data Warehouse
Enterprise Data Warehouse
Enterprise Data Warehouse
Group ERP — Materials and Inventory
Click any station to see who does it, what it costs in time, the rule that gates it and the system attributed to it.

Run the procedure

One unit walked along that swimlane on the happy viable agentified path

Press run and a single unit enters at station 01. Each station takes exactly the dwell this platform records for it and is held by whoever the estate says holds it.

speed
worked clock
00:00
allowance clock
00:00
stations cleared
0/7
the happy path, worked time0 min of 9.8 days
the same run against its allowance0 min of 17.6 days
Human
decides · 1
Agent
does the work · 6
GBS
shared spine · 0
run log

Nothing has happened yet.

where the worked time goes9.8 days a unit
Person42 hrs · 18%Agent8.1 days · 82%1 crossing between lanes
what makes this path viable
  • The lanes are the recorded lanes. 1 of the 7 stations stop for a person and every one of them still does on this run.
  • Every one of the 1 decision is still taken by the person who holds it. The happy path is that each one is released first time, not that it is skipped.
  • The owning team is held to a 60% autonomy ceiling and this run sits at 82% unattended, inside it.
  • 2 systems are attributed across the stations, and 0 of them are connected. Nothing in this run has been watched executing against a real system of record.
what would have to change

One decision, held by VP Supply Chain Strategy.

stays with a person
  • 07 ExCo ratify — The last decision on the line. Something on every procedure ends with a person, so this one is never offered.
what this run is, and what it is not

This is a run, not a forecast.

Happy means nothing goes wrong: no station raises an exception, no gate sends the unit back, no rework loop fires and nothing sits in a queue between stations.

The second clock is the allowance.

A decision may be handed to the agent lane only if two things hold …

The run reads the station rows only.

What this run does not model: arrival patterns, contention between procedures for the same person, shift patterns, weekends, learning curves, and the cost of anything.

Run it again, going wrong

The same unit, the same stations, broken the way the estate already records breaking

This is the same unit on the same stations, breaking.

No break below was chosen.

One play head, two tracks, the same scale. The clean run stops when it runs out of stations; the other one keeps going.

As written

7 stations, nothing waiting, nothing sent back

0 min of 9.8 days

now Frame · Network Modeling Agent · 35 hrs

As the ledger has it

the same stations, plus 3 categories the estate already counts

0 min of 10.0 days

now Frame · Network Modeling Agent · 35 hrs

personagentshared spinework the break addsnobody working it

What breaks, and where it is counted

No break below was chosen.

What the two runs say together

3 counted categories land on this procedure.

What this run cannot claim

These breaks are shown together on one unit so the shape of a bad day fits on one screen.

Two clocks run. Worked time is the sum of the time the work is actually being done …

Roles and responsibilities

8 named parties

The responsibility grid is assigned by a rule, not lifted from a chart.

PartyRACIStepsDutyEscalates to

Network Design Orchestrator

orchestrator

Runs the line0Sequences this line, holds its timetable and decides what has to surface to a person. Raises to VP Supply Chain Strategy when a unit falls outside the envelope or confidence drops below the floor.

Network Modeling Agent

agent

A2% autonomy · ceiling A2%

89% clean · 1% overridden

Responsible1Executes the network design step it owns, posts its evidence, and hands the unit to the next stage.Escalates to VP Supply Chain Strategy when the unit falls outside the decision envelope or confidence drops below the floor.

Cost-to-Serve Agent

agent

A3% autonomy · ceiling A3%

92% clean · 1% overridden

Responsible1Executes the service analytics step it owns, posts its evidence, and hands the unit to the next stage.Escalates to Head of Service Analytics when the unit falls outside the decision envelope or confidence drops below the floor.

Footprint Scenario Agent

agent

A2% autonomy · ceiling A2%

93% clean · 3% overridden

Responsible1Executes the network design step it owns, posts its evidence, and hands the unit to the next stage.Escalates to VP Supply Chain Strategy when the unit falls outside the decision envelope or confidence drops below the floor.

Service Level Modeling Agent

agent

A2% autonomy · ceiling A2%

97% clean · 7% overridden

Responsible1Executes the network design step it owns, posts its evidence, and hands the unit to the next stage.Escalates to VP Supply Chain Strategy when the unit falls outside the decision envelope or confidence drops below the floor.

Carbon Modeling Agent

agent

A2% autonomy · ceiling A2%

88% clean · 4% overridden

Responsible1Executes the network design step it owns, posts its evidence, and hands the unit to the next stage.Escalates to VP Supply Chain Strategy when the unit falls outside the decision envelope or confidence drops below the floor.

Network Strategy Agent

agent

A2% autonomy · ceiling A2%

94% clean · 13% overridden

Responsible1Authors positions on network design. Escalates when two options sit inside the confidence band and the evidence cannot separate them.

VP Supply Chain Strategy

person

Accountable and responsible1Holds 1 decision on this line. Accountable to VP Supply Chain Strategy for the decisions held here.

Decision points and escalation

1 places this procedure stops

07 · ExCo ratify

41.7 hrs

Held for a named human when the unit exceeds the network study decision envelope, when confidence falls below the floor, or when a policy clause is engaged.

VP Supply Chain Strategy

Handoffs out of this procedure

Nothing leaves this procedure for another function. It completes inside Network Design.

The rules this procedure runs inside

2 governing rules

Network Design Decision Envelope

under review

SC10-POL-200 · envelope · vv2.1

Agents in this lane may act without a human when the network study sits inside the stated value, risk and confidence envelope.

Approved by VP Supply Chain Strategy · in force 2025-12-22 · reviewed 2026-06-30

Binds Network Modeling Agent, Cost-to-Serve Agent, Footprint Scenario Agent, Service Level Modeling Agent, Carbon Modeling Agent

US · Canada

Network Design Evidence Standard

under review

SC10-POL-201 · evidence · vv5.9

Every autonomous decision writes inputs, the rule version applied, the model and prompt version, the output and a reversal path.

Approved by VP Supply Chain Strategy · in force 2026-05-12 · reviewed 2026-05-17

Binds Network Modeling Agent, Cost-to-Serve Agent, Footprint Scenario Agent, Service Level Modeling Agent, Carbon Modeling Agent

APAC

Systems this procedure touches

2 named · 0 connected

System attribution is a rule, not a reading.

SystemVendorDomainCriticalityStepsConnection
Enterprise Data WarehouseSnowflakeanalyticscritical6modeled
Group ERP — Materials and InventorySAP S/4HANA MMsupplyhigh1modeled

0 of the 2 systems on this procedure is connected to the platform, and none of the twenty-six in the estate register is. 1 of them are marked as taking a write back, which is a property of the system, not a live path from here.

How it performs

End to end

9.8 days

Summed from the time each step sits, standard 17.6 days — running at 56% of the standard.

Touchless

24%

Agent share

86%

A week

3

In flight

146

Effort a week

2,502 human minutes · 11,654 agent minutes

Volume multiplied by the time on each step.

Assurance over this procedure

4 governance gates sit above it

The twenty-four controls and eighteen exception classes in this platform are held at estate level …

GateWhat trips itWho releases itClockWaivable

Weekly plan change above 10%

approval

Replanning that shifts more than 10% of a weekly production or replenishment planPlanning lead4 hoursNo

Premium freight above $50,000

approval

Any expedite decision above $50,000Logistics director2 hoursNo

Customer allocation decision

approval

Any allocation that reduces a committed customer quantityCSCO with SalesSame dayNo

Plan-stability monitor

oversight

Continuous check for order amplification and repeated replanning signaturesSupply Chain Chief of StaffContinuousNo

What this document is and is not

These procedures describe the modeled estate.

Actions

What is waiting on a person

What one procedure document gives you, and what to check before you treat it as the standard.

Operations

What this desk is allowed to start

A surface that only reports is not operable.

Trigger and bound

A procedure document prints purpose, scope, entry and exit, the numbered steps with the actor on each, the roles and their RACI position, the swimlane, the decision points and escalation, the handoffs, the governing rules with version and approver, the systems by rule and the timings.

Live observability

What the record shows right now

The whole library, by lane, so a single document can be read against the estate it came from.

Current distribution

2,748 steps

Agent, inside the function1,38951%
Agent, on the shared spine85131%
Person deciding at a gate50818%

Is policy and strategy coming to fruition

Whether the written intent is holding here

Half. The document is complete and every actor on it is measured

Not holding on the record

A procedure here carries a version, an approver, an in-force date and a last-review date.